{"infobox":{"dc_creator":"WooScraper_v1","dc_date_year":1981,"dc_description":"The system signals and analyses changes in the traffic flow. Drivers are warned of these changes by means of maximum speeds displayed on matrix-sings. The system is also used when roadworks are under way. Arrows and crosses shown on the same sigs indicate clearly to drivers the lanes which may ...","dc_identifier":"nl.oorg10004.2j.1981.641","dc_publisher":"oorg10004","dc_publisher_name":"Overheidsorganisatie Rijkswaterstaat","dc_source":"https://open.rijkswaterstaat.nl/open-overheid/onderzoeksrapporten/@233047/motorway-signalling-new-incentives-put/","dc_title":"Motorway signalling new incentives put traffic on the richt track","dc_type":"2j","dc_type_description":"2j - Onderzoek","foi_extraMetadata":{},"foi_fairiscoreVersions":{"v1":5,"v2":5},"foi_files":[{"dc_format":"application/pdf","dc_identifier":"nl.oorg10004.2j.1981.641.doc.1","dc_source":"https://open.rijkswaterstaat.nl/publish/pages/162750/motorway_signalling.pdf","dc_title":"motorway_signalling.pdf (pdf, 11 MB)","dc_type":"bijlage","foi_doc_missing":1,"foi_fairiscoreVersions":{"v1":5,"v2":5},"foi_fileName":"motorway_signalling.pdf","foi_nrPages":6}],"foi_isWoo":"Ja","foi_nrDocuments":1,"foi_nrPagesInDossier":6,"foi_page_title":"Onderzoek Overheidsorganisatie Rijkswaterstaat","foi_publishedDate":"1981-01-01","foi_retrievedDate":"2024-07-18","tooiwl_type":"c_fdaee95e"},"resource":"nl.oorg10004.2j.1981.641"}
