Naar inhoud
Overheidsorganisatie Rijkswaterstaat

EUROCOR : European Urban Corridor Control : project V 2017 : deliverable 11A, workpackage W.P. 6.2 : experimental results and comparative analysis

Jaar: 1995 Documenten: 1
This report consists of an executive summary and the report "An assessment of multiple ramp metering on the Amsterdam ring-road". It describes the effects of ramp metering on four locations at the A10-West (RW10) in Amsterdam by comparing the ZERO situation (before the installation of three of ...

Documenten (1)